New 1/2 Klegecell closed marine foam deck. West system epoxy two layers double bias cloth . Needs woodwork put back in with all new bronze portholes . The hard nasty work is done. Foote out a couple of layers of cloth. And she is ready for the deck hardware that has been replayed.
Equipment:
Diesel engine with hydraulic drive to shaft. Pedestal steering station with hand fitted gears in Bar Harbor. All the wenches are repeated. Floyd out the deck, and a sheet of a Starboard over the old porthole holes. Install new bronze ones.