Boat has been completely gone through. I have benn living aboard for almost 3 years now. Brand new EV-200 below deck auto pilot. Updated LED lighting and fixtures. 2nd shore power added. 16000 BTU Air Conditioner, Refrigerator, stove top, oven, microwave. New Main sail 1 year ago. All instruments are in good and working order. Boat is in great shape and ready to Sail now! Many more updates and receipts for all work completed available.
Equipment:
Work Completed Date Replaced head hoses to waste tank 11/1/2020 New Y valve for waste 11/2/2020 Jib sail inspected and restitched 12/1/2020 New Racor Fuel Filter 12/20/2020 New Engine Yanmar Fuel Filter 12/20/2020 New Dripless packing Gland installed 1/6/2021 Bottom Job 1/6/2021 Exterior Teak sand and varnish 1/26/2021 Compound and Wax exterior 5/10/2023 Oil all interior Teak 1/22/2021 new Fenders and dock lines 1/27/2021 New 50' Shore Power Cord 1/28/2021 New propeller 1/28/2021 R&R new prop and 2 new Zinc's 1/28/2021 New Electric Stove top option 12/22/2020 New GE deHumidifyer 12/23/2020 New 24" smart TV 1/16/2021 New Raymarine Wind Transducer 1/28/2021 Install wind tansducer and inspect main furler and rigging 1/28/2021 Shore Power inlet recepticle replaced and spare purchashed 1/28/2021 New Main Sail from Quantum Sails 3/22/2021 New Companionway cover 3/3/2021 New Convertible Cover 3/3/2021 New Windvane 3/3/2021 New LED Anchor Light Assembly 3/3/2021 New VHF Antenna 3/3/2021 New LED MASTHEAD Deck Light Assembyl 3/3/2021 New Spreader Boots 3/3/2021 Install all new items on mast and tune Rigging 3/3/2021 Raymarine EV-200 Autopilot 6/13/2023 Install new Auto Pilot 6/14/2023 New Waste Tank Vent 3/2/2021 New Waste Tank Line and Vent line 3/3/2021 New Outhaul line 3/5/2021 New Boom Vang Line 3/6/2021 Rebuild Head Kit 3/12/2021 New Head pump housing 3/15/2021 New Sea Water Pump rebuild kit 4/13/2021 SmartPlug 5/5/2021 New AC Panel and wiring 5/23/2021 New Galvanic Isoloator 5/15/2021 Oil change and filter 8/25/2021 New Mainsheet line 9/12/2002 New Altenator belt 9/5/2021 Spare Sea Water pump belt 9/5/2021 New Thermostat and gasket 9/5/2021 Clean Heat exchanger inlet and replace gaskets/o-rings 9/5/2021 3 new 12v Marinco Fans 8/1/2021 New Mainsheet block 9/12/2021 New AC filter cold air return 9/5/2021 2 new traveler lines 9/16/2021 New cooler hose 9/21/2021 Bottom Cleaned and new Zinc's installed 9/22/2021 New Mast boot 3/1/2022 Scupper Hoses 3/28/2022 Water Heater Releif Valve 3/22/2022 Water Heater subfloor replaced 3/28/2022 Bottom Cleaned and new Zinc's installed 5/18/2022 Bottom Cleaned and new Zinc's installed 11/30/2022 Sole refinished 11/30/2022 Bottom cleaned every 3 months